News Releases

MPA and PSA Singapore Seek Proposals for Autonomous Shipping to Modernise Port Operations

April 22 2026

The Maritime and Port Authority of Singapore (MPA) and PSA Singapore (PSA) have launched an Expression of Interest (EOI) to invite proposals to develop and test autonomous inter-gateway container feeder vessel operations within Singapore’s port.

2. Inter-gateway container feeder vessels move containers between terminals within the Port of Singapore (e.g. between Tuas and Pasir Panjang terminals), playing a crucial role in daily port operations. As vessel traffic grows, it is important to ensure that such movements are conducted efficiently, safely, and reliably.

3. The EOI is part of MPA and PSA’s efforts to explore autonomous technologies and assess their technological readiness, operational feasibility, and safety for use in port operations. The inter-gateway context provides an operationally rigorous environment to assess productivity, safety, and sustainability benefits. As autonomous capabilities advance, they are also expected to create new career opportunities, such as in remote vessel monitoring and operations, autonomous systems engineering, maritime data analytics, and specialised technical maintenance roles.

4. The EOI also includes plans for a remote operations centre, where information from vessels’ sensors and port traffic data will be integrated to enable real-time monitoring and timely intervention. This will form part of the core safety and assurance system for autonomous operations.

5. Applicants are expected to address several key considerations in their proposals, such as navigational safety, interaction with manned vessels, traffic management, system redundancy, cybersecurity, human-machine interfaces, and regulatory compliance. Proposals should articulate the operational limits, technological readiness, and risk mitigation measures relevant to inter-gateway deployment. Proposals must also include viable business models, and ensure that their solutions meet PSA’s operational and integration requirements.

6. Interested parties are invited to submit their proposals by 24 July 2026, 12.00 PM. Further information and submission guidelines are available at the MPA website.

Share:

Latest Updates

PSA International Pte Ltd And Its Subsidiaries Results For The Year Ended 31 December 2025

March 09 2026
View details

PSA Singapore and Mitsui O.S.K. Lines Form Strategic Joint Venture to Establish a Ro-Ro Terminal in Singapore

January 30 2026
View details

PSA International’s 2025 Container Throughput Performance

January 14 2026
View details

PSA Singapore and COSCO Expand Collaboration Beyond Port Operations with Regional Distribution Facilities in Singapore

September 15 2025
View details
PSA Singapore
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.